Tuesday, April 29, 2014

NEW Facility is complete



The Geronimo, NM facility is complete and ready to start work on exciting new projects for both Dynamic Bio Systems in-particular and the Ilria corporate family as a whole


/* Everything is integrated (models, textures, lighting, animation, kismet basic programming) and packaged.

Video was recorded of the environment, edited and uplifting elevator music added

Meshes, Textures, Research, UDK Materials, Animation, Video Capture & Editing-Chris Jordan
Architechural Drafting - Charles Jordan
Music: Friday Night in the Lounge by Marius Joppich CC license (BY_NC_SA)
*/

Tuesday, April 22, 2014

Wiring Completed

/* Door animations added, Lighting added, 1st floor public bathrooms added

Added character will not be added in the environment */

Monday, April 14, 2014

Glass fittings are complete 4/7/14


/* window for the exterior, and interiors are fitted in bsp and materials added*/

Tuesday, April 1, 2014

Filling the Labs

The Labs are on pace to be filled with their equipment.
/* meshes are being placed within the environment and textures are continued to be developed for both the meshes and bsp enplacements