Tuesday, April 29, 2014
NEW Facility is complete
The Geronimo, NM facility is complete and ready to start work on exciting new projects for both Dynamic Bio Systems in-particular and the Ilria corporate family as a whole
/* Everything is integrated (models, textures, lighting, animation, kismet basic programming) and packaged.
Video was recorded of the environment, edited and uplifting elevator music added
Meshes, Textures, Research, UDK Materials, Animation, Video Capture & Editing-Chris Jordan
Architechural Drafting - Charles Jordan
Music: Friday Night in the Lounge by Marius Joppich CC license (BY_NC_SA)
*/
Tuesday, April 22, 2014
Wiring Completed
/* Door animations added, Lighting added, 1st floor public bathrooms added
Added character will not be added in the environment */
Added character will not be added in the environment */
Monday, April 14, 2014
Tuesday, April 1, 2014
Filling the Labs
The Labs are on pace to be filled with their equipment.
/* meshes are being placed within the environment and textures are continued to be developed for both the meshes and bsp enplacements
Tuesday, March 18, 2014
Lab supplies are being recieved
1/3 of the lab supplies are been received from general company supply
Tuesday, March 4, 2014
Stainless steel bathrooms
The stainless steel fixtures for the facility bathrooms have been installed.
// Bathroom assets are textured
// Bathroom assets are textured
Tuesday, February 25, 2014
The Bio-Sculpting Lab is taking Shape
Designed by Jordan & Jordan and Associates the new 2 story Lab will provided needed research & development capacity to the Geronimo, NM facility.
A new 3D rendering of the facility will be coming soon
A new 3D rendering of the facility will be coming soon
Monday, February 3, 2014
New Bio-Sculpting lab is about to be established!
Utilizing such sculpting tools as Zbrush, Sculptris and Mudbox this lab will enable Dynamic Bio Systems to re-sculpt or even generate new organic structures for use in product research and development.
Dynamic Bio Systems Re-sculpting Your Way of Life
//:
For the Weeks of February the 3rd & 10th Character Developer Andres will be researching 3D sculpting software and deciding which one will be used to model the character
During the same period the Environmental Developer Chris Jordan will delve into the number of Laboratory facilities (private, academic and governmental) whose plans can be found in a number of architectural design journals and magazines, such as Columns, A10, Architectural Record, Architect and especially Texas Architect (for local buildings that may be measured to confirm scale) in order to develop a generic yet contextually appropriate floor plan for the interior space.
://
Dynamic Bio Systems Re-sculpting Your Way of Life
//:
For the Weeks of February the 3rd & 10th Character Developer Andres will be researching 3D sculpting software and deciding which one will be used to model the character
During the same period the Environmental Developer Chris Jordan will delve into the number of Laboratory facilities (private, academic and governmental) whose plans can be found in a number of architectural design journals and magazines, such as Columns, A10, Architectural Record, Architect and especially Texas Architect (for local buildings that may be measured to confirm scale) in order to develop a generic yet contextually appropriate floor plan for the interior space.
://
Monday, January 27, 2014
Breaking the 4th wall (Part 1)
Dynamic Bio Systems Environment Production initial schedule and initial pre-production information
- Develop initial environment concept
- Discuss with Character Developer (Andres) what type of environment will be appropriate for the display of the character. (deadline: 1/27/14)
- Discuss with Character Developer how the character in its environment should be displayed and if a narrative should accompany this display or declared within the environment. (deadline: 1/29/14)
- Research similar environments
- Find a selection of buildings that serve the requested function which has ready accessible floor plans (i.e. need a lab find a selection of research lab floor plans) available (preferably in the DFW area) (deadline: 2/11/14)
- Find a selection of assets that would be found in said environment and find orthographic views, design specs, or Revit meshes of each item (deadline: 2/15/14)
- Develop a basic floor plan for a 1 or 2 level building (deadline: 2/22/14)
- Build the layout of the environment
- Generate a floor plan in Maya/ Unity (deadline: 3/21/14)
- Generate & Integrate structural Façade (deadline: 3/21/14)
- Light structure (deadline: 4/19/14)
- Texture floor plan & structural Façade (deadline: 4/27/14)
- Generate, Texture & Integrate assets (deadline: 4/27/14)
- Integrate developed Character
- Place character into environment (deadline: 4/29/14)
Pre-production
- Environment Requirement
- According to the Character Developer’s design (Andres) with its blend of the biological and the technological a “haunted house”, “cave system”, “castle”, ect would be insufficient but a biomedical lab might fit the bill
- Environmental
Reference Images
- Asset reference images







Welcome to Dynamic Bio Systems' English language website
Dynamic Bio Systems is a Bio Technology firm based in beautiful Merida, Mexico with a number of satellite lab installations in Geronimo, NM in the US and Asbeck, Germany focusing on advanced prosthetic manufacture and advanced Pharmacological creations
Subscribe to:
Posts (Atom)










